Land Application

Land application used to convey POME from palm oil mill to land (block). POME BOD  value that can used for LA maximum 5.000. Capacity for LA area/years is 750 Ton. If the rainfall and soil absorbtion condition is normal, my calculation show the land needed is 5 Ha/TPH mill capacity.

Design needed :

  1. Flatbed dimeension and overflow gutter, depend on the countour and soil conditions.
  2. Pumps capacity and head, calculate using distance and volume
  3. Piping selection diameter and materials.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s